The project of installing the reservoir was preceded by the project of installing the heat pump, which was carried out based on our idea and according to our project documentation.
During exploitation, it was concluded that there is room for improving the working conditions of the heat pump by increasing the period of operation in the mode of 100% capacity of the heat pump, by adding two additional reservoirs.
The project was carried out on a “turnkey” basis, from the idea, the creation of technical documentation, the execution of mechanical works and commissioning.
Technical documentation
As part of the technical documentation, we deliver:
Mechanical project
Attestation and technical documentation of pressure vessels
The appearance of the future installation is previously drawn as a 3D model, which we coordinate and define details together with the investor.
Realization of the project
The realisation of the project is completely under our control and under continuous supervision. Many investors understand what it means when a project is “turnkey” only after working with us. We fulfill everything that has been agreed in compliance with general and internal standards related to EHS.